Flood History & Resilience

Understanding the water. Protecting the future.

This collection brings together flood records, mapping resources, photographic documentation and engineering studies relevant to the Stanley-Wasson property and surrounding Waterbury neighborhood.

These resources help explain the property's history of flooding, its current floodplain conditions and the considerations involved in evaluating future land use.


Stanley-Wasson: Flood History & Site Conditions

March 17, 2021 | Act 250 Demolition Permits — Stanley and Wasson Halls

Vermont District 5 Environmental Commission

Act 250 permits 5W0431-12 and 5W1012-3 authorized demolition of the flood-damaged buildings, associated utility and drainage improvements, and restoration of the former building sites to an open grassed field.

The Vermont Division for Historic Preservation (VDHP) participated in the review. The State's historic-resource documentation addressed the buildings' historical significance, extensive flood damage and substantial rehabilitation costs.

The permitted project proposed restoring the former building sites to open grassed land as part of the campus flood mitigation plan. No new structures were proposed at that time.

View Original Act 250 Permit Records

July 11, 2023 | Overnight Flooding at Stanley-Wasson

Timestamped neighborhood photograph taken at 12:26 a.m., documenting extensive flooding across the former Stanley and Wasson Hall grounds.

According to neighborhood observations, floodwaters reached their highest levels at approximately 2:00 a.m.

July 2023 and July 2024 | Flooding Following Demolition

Town of Waterbury — Stanley-Wasson Hall Area: Permitting Context, February 11, 2026

The Town's presentation includes photographs documenting inundation of the property during both flood events.

The photographs were taken during the morning hours, after the reported overnight peak in 2023 and flood waters began to recede.

View Town Presentation — Flood Photographs

Flood Maps & Floodplain Information

March 19, 2013 | FEMA Flood Insurance Rate Maps — Waterbury, Vermont

Federal Emergency Management Agency (FEMA)

Waterbury's effective flood maps identify Special Flood Hazard Areas (SFHAs), including Zone AE, which encompasses much of the proposed Stanley-Wasson parcel.

Although the maps became effective in 2013, the underlying hydrologic information was last updated in 1998. These maps predate the significant flooding of 2023 and 2024.

View Official FEMA Flood Maps

Vermont Flood Ready Atlas | Flood Hazard & River Corridor Mapping

Vermont Agency of Natural Resources

An interactive map showing federally designated flood hazard areas, floodways and State-mapped river corridors.

This resource allows residents to examine Stanley-Wasson's location in relation to mapped flood hazards and the surrounding neighborhood.

Explore Vermont Flood Ready Atlas

Waterbury Flood Inundation Mapper | Winooski River Flooding Scenarios

U.S. Geological Survey / Vermont Flood Ready

An interactive mapping resource illustrating estimated floodwater extents at different Winooski River levels.

The underlying USGS study incorporates updated hydrologic information through 2014 and provides additional context beyond the effective FEMA flood maps.

These scenarios are useful planning tools but do not replace official regulatory flood maps or site-specific engineering analysis.

Explore Waterbury Flood Inundation Mapper

Understanding Flood Maps

Flood hazard maps are important planning and regulatory tools, but they do not capture every possible flood event or localized drainage condition.

The property's mapped flood hazards should be considered alongside documented flooding, neighborhood observations and site-specific engineering analysis.

Randall Meadow Floodplain Reconnection

June 19, 2025 | Randall Meadow Floodplain Restoration — Benefit-Cost Analysis

Prepared by SLR International Corporation for Vermont Emergency Management.

This preliminary engineering analysis examines the proposed reconnection of approximately 40 acres of Randall Meadow to the Winooski River floodplain through the removal of approximately 100,000 cubic yards of material.

While the report describes potential reductions in flood elevations ranging from 0.1 to 1 foot, the results vary significantly by location and flood magnitude.

The greatest modeled reduction of approximately 1 foot occurs during the 50-year flood scenario at certain upstream locations. For the 100-year and 500-year flood scenarios, the supporting hydraulic analysis shows reductions of approximately 0.1 foot (1.2 inches) at two modeled river cross-sections.

The analysis does not establish how much relief Stanley-Wasson would have experienced during the July 2023 flood, nor does it demonstrate that the property would be protected from future inundation.

The findings are preliminary and require additional investigation, updated two-dimensional hydraulic modeling, final design and permitting.

View SLR Benefit-Cost Analysis — June 19, 2025

View Supporting Hydraulic Modeling Results — Attachments 6 and 7

2025–2026 | Randall Meadow Flood Mitigation Project

Town of Waterbury

The Town is pursuing a floodplain reconnection project intended to reduce existing flood risks to nearby homes, businesses and infrastructure.

In November 2025, the project received a conditional federal Community Development Block Grant–Disaster Recovery (CDBG-DR) award of up to $2 million. Waterbury voters approved borrowing authority of up to $4.3 million on March 3, 2026.

The project remains subject to environmental assessment, final engineering, permitting and implementation.

View Town of Waterbury — Flood Mitigation Project, Funding and Updates

View December 10, 2025 — CDBG-DR Grant Award Letter

October 6, 2025 | Potential Connection to Stanley-Wasson

Town of Waterbury — Stanley-Wasson Development Project Presentation

The Town's presentation raised a possible connection between Randall Meadow and the proposed Stanley-Wasson development through Vermont's Community and Housing Infrastructure Program (CHIP).

The presentation acknowledged uncertainty regarding the eligibility of flood mitigation involving neighboring parcels and specifically raised the question of a “Randall Meadow nexus.”

The two projects remain separate, with distinct objectives, funding sources and regulatory responsibilities.

Any proposal to use publicly funded flood mitigation benefits at Randall Meadow to offset obligations associated with private development at Stanley-Wasson would require further engineering, regulatory, financial and grant-compliance review.

No approved arrangement linking Randall Meadow's flood storage to Stanley-Wasson's development obligations has been identified.

View October 6, 2025 — Town's Stanley-Wasson Presentation, Final Slide

Environmental Review and Potential Project Connections

Randall Meadow is undergoing a federally required environmental review associated with its CDBG-DR funding.

Under 24 CFR § 58.32, geographically or functionally related activities may need to be evaluated together as part of a single environmental review. Section 58.47 requires re-evaluation when substantial project changes, new environmental conditions or changes in alternatives affect earlier findings.

If Randall Meadow were formally proposed as compensatory flood storage or other mitigation for Stanley-Wasson, the relationship between the projects would need to be examined under these federal environmental review requirements.

Such review would not, by itself, authorize the proposed arrangement. Separate regulatory approvals and compliance with applicable grant conditions could also be necessary.

24 CFR § 58.32 — Project Aggregation

24 CFR § 58.47 — Re-evaluation of Environmental Findings

Understanding the Relationship Between the Two Properties

Randall Meadow and Stanley-Wasson are separate projects with different objectives.

Randall Meadow seeks to reduce existing flood risks through floodplain reconnection. Stanley-Wasson is being evaluated for new residential development within a Special Flood Hazard Area.

The preliminary Randall Meadow findings do not establish that Stanley-Wasson would become flood-free or suitable for residential development.

Any proposed connection between the projects must be evaluated for its engineering feasibility, environmental impacts, regulatory compliance, financial responsibilities and effects on the intended public benefits of Randall Meadow.