Public Record & FAQ
Informed decisions begin with access to the facts.
Original documents. Public decisions. Outstanding questions.
Access to accurate information is essential to meaningful community participation.
The Stanley Wasson Community Alliance has compiled public records, historical documents, municipal agreements, regulatory information and correspondence to help residents better understand the property and the decisions surrounding its future.
We distinguish documented facts from outstanding questions and the Alliance's own perspectives.
We encourage residents to explore the original documents and draw their own informed conclusions.
Frequently Asked Questions
Explore by subject
-
Does Waterbury have to purchase the property?
No. The Town holds an option to purchase the property, not an obligation to purchase it.
Can the State sell the property to another developer?
Not under the existing legislative authorization. Act 69 (H.493), enacted in 2023, authorizes the sale specifically to the Town of Waterbury.
A sale to another purchaser would require separate legislative authorization. Any future developer would still be subject to applicable land-use regulations, floodplain requirements, permitting obligations and historic preservation requirements.
Supporting links:
Act 69 (H.493), 2023 — Section 22(b), page 30
29 V.S.A. § 166 — Selling or renting State property
Has the property been subdivided?
As of November 20, 2026, no approved subdivision has been identified. The property remains part of the larger State-owned, Act 250-permitted tract.
The State must complete the applicable subdivision permitting process to establish a separate legal parcel.
Supporting links:
-
Is Stanley-Wasson in a Special Flood Hazard Area?
Yes. A substantial portion of the proposed parcel lies within a federally mapped Special Flood Hazard Area (SFHA), Zone AE.
Waterbury's existing FEMA Flood Insurance Rate Maps date to March 19, 2013, and rely on hydrologic data last updated in 1998. These maps predate the significant flooding experienced in 2023 and 2024.
Supporting links:
Vermont Flood Ready — Waterbury Flood Inundation Mapper
February 11, 2026 — Stanley-Wasson Permitting Context
Does the land currently hold floodwaters?
Yes. During the July 2023 and July 2024 floods, neighborhood residents observed floodwater accumulating on the Stanley-Wasson property, with river inundation and overwhelmed stormwater infrastructure contributing to local flooding.
Residents have also observed water accumulating on the property before reaching portions of upper Randall Street.
This existing floodplain function must be understood and evaluated before the land is altered.
Would elevating the buildings eliminate flood risk?
No. Elevating buildings may reduce the risk of flood damage to occupied floors, but it does not prevent the surrounding land, streets, parking areas, utilities or infrastructure from flooding.
Safe access, evacuation, emergency response and potential impacts on neighboring properties must also be addressed.
Protecting buildings is not the same as protecting people.
Will the Randall Meadow floodplain reconnection protect this property from flooding?
The project may reduce flood risk, but it is not designed to eliminate flooding.
Randall Meadow and Stanley-Wasson are two distinct projects with different objectives. One seeks to reduce existing flood risk; the other proposes introducing new residential development into a Special Flood Hazard Area.
The potential benefits of Randall Meadow should not be assumed to establish the safety or suitability of developing Stanley-Wasson.
Vermont Flood Ready — Waterbury Flood Inundation Mapper
-
What is compensatory flood storage?
Compensatory flood storage replaces space available for floodwaters that would otherwise be lost through development, including the placement of buildings, foundations and fill.
Its purpose is to offset the loss of existing flood storage capacity, rather than create additional flood protection for the community.
What are Waterbury's compensatory flood storage requirements?
Under Sections 604 and 605 of Waterbury's Zoning Regulations, where compensatory flood storage is required, it must:
Replace displaced flood storage at equivalent elevations.
Be above the water table and hydrologically equivalent.
Not increase the Base Flood Elevation or reduce existing floodplain storage capacity.
Avoid adverse impacts on existing structures during the base flood.
Be provided during the same construction season in which flood storage is displaced.
Compliance must be demonstrated through appropriate engineering analysis and certification.
Certain designs that do not affect floodwater storage may qualify for exceptions.
Supporting link:
Who is responsible for providing compensatory flood storage?
The applicant is responsible for demonstrating compliance with applicable flood hazard regulations.
Under Section 14(c) of the executed Pre-Development Agreement (PDA), DEW is financially responsible for obtaining the housing project's required municipal and State permits.
Section 4 also requires DEW to work with the Town to identify mutually agreeable flood storage solutions and evaluate potential flood impacts on neighboring properties and the Randall Street neighborhood.
Supporting link:
Can compensatory flood storage be provided on another property?
Potentially. However, identifying available land elsewhere does not automatically satisfy compensatory flood storage requirements.
Any proposed off-site solution would need to demonstrate hydrologic equivalence, compliance with applicable regulations and the absence of adverse impacts on existing structures during the base flood.
The location, elevation, available storage capacity and movement of floodwaters are important considerations.
Could Randall Meadow be used to satisfy DEW's compensatory flood storage requirements?
This remains an outstanding question.
Randall Meadow is being pursued as a publicly funded flood mitigation project intended to reduce existing flood risk within the community.
Any proposal to use its additional flood storage capacity to offset development at Stanley-Wasson would require careful evaluation of regulatory requirements, engineering feasibility, grant funding conditions and the project's intended public benefits.
As of November 20, 2026, no approved arrangement for this purpose has been identified.
Supporting link:
Could using publicly funded flood storage for private development diminish its intended benefits to the community?
Potentially. Using additional flood storage to compensate for storage lost through new development could reduce the net flood mitigation benefits that would otherwise be achieved.
The Alliance believes that public investment in flood resilience should prioritize reducing existing flood risk and should not subsidize private development at the expense of those intended public benefits.
Reducing existing flood risk is not the same as compensating for newly introduced development.
-
Has housing always been the intended use of the Stanley-Wasson property?
Housing has been considered among several potential uses of the property over the years.
The 2013 Community Survey identified support for higher-density housing at the broader State Office Complex property. However, that same survey also identified support for stronger regulation of floodplain development. Both findings were carried forward into the 2018 Municipal Plan.
Since the original 2013 survey, several significant events have occurred:
The listing of the Vermont State Hospital Historic District on the National Register of Historic Places in 2016.
The demolition of Stanley and Wasson Halls and restoration of their former building sites to open green space in 2021.
The significant flooding experienced in 2023 and 2024.
The proposed 2026 Town Plan, informed by more recent community engagement, continues to recognize the need for additional housing while acknowledging the importance of flood resilience, neighborhood character and the protection of flood-prone areas. It also specifically identifies the Elm/Randall Street neighborhood as vulnerable to flooding.
The Alliance believes earlier development objectives should be reconsidered in light of the property's historic significance, present condition, existing floodplain function and the community's more recent experiences with flooding.
Supporting housing does not necessarily mean supporting housing at this location.
Supporting documents:
2018 Waterbury Municipal Plan — Chapter 11
Proposed 2026 Waterbury Town Plan
Proposed 2026 Town Plan — Flood-Prone Housing and Neighborhoods
Does Stanley-Wasson qualify as infill development?
This has yet to be formally established.
Vermont's Flood Hazard Area and River Corridor Rule distinguishes between infill development and redevelopment. These definitions are particularly important when determining eligibility for certain Act 250 housing exemptions within mapped flood hazard areas.
Although Stanley-Wasson is located within an established village neighborhood, the former buildings were demolished in 2021 and their sites restored to open green space as part of a flood mitigation plan.
There is an important distinction between developing an ordinary vacant lot within an established neighborhood and developing land intentionally returned to open space for flood mitigation.
The property's history, present condition and existing floodplain function warrant careful consideration in determining its eligibility as infill development.
An infill designation does not establish site suitability, eliminate flood risk or constitute development approval.
Has the Stanley-Wasson housing development been approved?
No. The Pre-Development Agreement (PDA) provides DEW with a 12-month exclusive due diligence period to evaluate project feasibility.
It does not constitute development approval, authorization to construct housing or a binding agreement to purchase the property.
Supporting link:
Executed Pre-Development Agreement — Sections 6, 7 and 16
Has the number of housing units been determined?
No. The concepts presented in 2025 were preliminary. The final unit count, housing mix and building configurations remain subject to feasibility studies, site constraints and applicable permitting requirements.
Supporting link:
DEW Properties — September 2025 RFQ Response
Is affordable housing guaranteed?
No. The PDA anticipates market-rate housing first, with senior, workforce or affordable housing in a subsequent phase.
Affordable housing remains a stated objective rather than a guaranteed outcome.
Supporting link:
Will Waterbury residents be given priority for housing?
The PDA provides for advertising the units to Waterbury residents 30 days before general public marketing.
This is an advance marketing opportunity, not a guarantee of housing availability, affordability or preferential allocation to current residents.
Supporting link:
Has the Town agreed to change its zoning regulations to accommodate the development?
The Town has agreed to request Planning Commission consideration of zoning amendments if needed for project feasibility.
The PDA does not itself approve or enact any zoning changes. Such amendments would remain subject to the applicable municipal process.
Supporting link:
Is the developer required to provide public progress updates?
DEW must meet with Town representatives monthly and submit written updates every other month.
However, public sharing of those updates is encouraged rather than expressly required by the PDA.
Supporting links:
Executed Pre-Development Agreement — Sections 10 and 11
Town of Waterbury — Housing Planning and DevelopmentItem description
-
Is Stanley-Wasson currently subject to Act 250?
Yes. The property remains part of the larger State-owned, Act 250-permitted tract associated with the Waterbury State Office Complex.
Whether a future residential development would require an Act 250 permit or permit amendment depends on the proposed development, existing permit conditions and eligibility for any applicable exemptions.
Supporting link:
Act 250 — Existing Stanley-Wasson Permits 5W0431-12 and 5W1012-3
What significance do the 2021 Act 250 demolition permits have?
The permits authorized the demolition of the flood-damaged Stanley and Wasson Halls, associated utility and drainage improvements, and restoration of the former building sites to an open grassed field.
These permits did not authorize new residential development.
The property's existing permit history and restoration to open space are important considerations when evaluating future development proposals.
Supporting link:
March 17, 2021 — Act 250 Demolition Permit Records
Has Act 250 jurisdiction been formally determined for the proposed housing development?
Not to our knowledge.
On June 1, 2026, abutting property owners submitted a request for a Jurisdictional Opinion (JO) to clarify the applicability of Act 250 to the proposed development.
In July 2026, the Land Use Review Board advised that a determination was premature because the proposed development was not sufficiently defined.
As of November 20, 2026, no formal determination exempting the proposed housing development from Act 250 has been identified.
Supporting link:
Vermont Land Use Review Board — Jurisdictional Opinions
Could the development qualify for a Priority Housing Project exemption?
Potentially, if the development satisfies the applicable statutory requirements.
The temporary Priority Housing Project exemption includes mixed-income housing requirements and required a qualifying Jurisdictional Opinion request on or before June 30, 2026.
The proposed Stanley-Wasson development has not been established as meeting these requirements.
Supporting link:
Vermont Land Use Review Board — Interim Housing Exemptions
Does Stanley-Wasson's downtown location automatically qualify it for an Act 250 housing exemption?
No. Vermont's interim designated downtown housing exemption, extended until January 1, 2028, under Act 152 of 2026, includes specific limitations concerning development within mapped floodplains and river corridors.
An exception exists for areas containing preexisting development that meet the applicable definition of suitability for infill development.
Whether Stanley-Wasson meets these requirements has not been formally established.
Supporting links:
10 V.S.A. § 6081(dd)(3) — Interim Housing Exemptions
Act 152 of 2026 — Section 6, pages 3–6
What does Tier 1B designation mean?
Tier 1B is a State-approved land-use designation that allows qualifying housing developments to proceed without an Act 250 permit or permit amendment.
Under current legislation, the exemption applies to qualifying housing and mixed-use projects of 50 housing units or fewer on 10 acres or less.
The process for establishing Tier 1B areas includes specific requirements concerning flood hazard areas, municipal regulations, infrastructure capacity and municipal development review.
On September 15, 2026, the Waterbury Selectboard adopted a formal resolution requesting Tier 1B status for its mapped Downtown Center, Village Center, Village Area and Planned Growth Areas.
The signed resolution expressly states:
“The area excludes identified flood hazard and fluvial erosion areas.”
This exclusion is particularly relevant given Stanley-Wasson's location within a federally mapped Special Flood Hazard Area.
The Central Vermont Regional Planning Commission adopted its Regional Plan on October 20, 2026. As of November 20, 2026, the plan and Tier 1B application remain under review by the Land Use Review Board, with a public hearing scheduled for December 4, 2026.
Tier 1B designation does not establish site suitability, constitute development approval or eliminate applicable municipal flood hazard regulations.
Supporting links:
September 15, 2026 — Waterbury Signed Tier 1B Municipal Resolution
10 V.S.A. § 6033 — Regional Plan Future Land Use Map Review
10 V.S.A. § 6081 — Act 250 Permits and Exemptions
Land Use Review Board — CVRPC Regional Plan and Tier 1B Application
Does an Act 250 exemption override Waterbury's flood hazard regulations?
No. An Act 250 exemption does not eliminate applicable municipal zoning, flood hazard regulations or other State and federal permitting requirements.
Waterbury's Development Review Board would still be responsible for reviewing the proposed development under applicable municipal regulations.
Requirements concerning floodwater displacement, compensatory storage, site design and public safety must still be addressed where applicable.
Supporting link:
What additional permits and approvals would be required?
Depending on the final development proposal, applicable permits and approvals may include:
State and municipal subdivision approvals.
Act 250 permits or permit amendments, unless exempt.
Municipal site plan and development review.
Special Flood Hazard Area development approval.
Water and wastewater permits and connection approvals.
Stormwater permits.
Applicable historic preservation review.
State construction and fire safety permits.
The final permitting requirements cannot be fully established until a sufficiently detailed development proposal is available.
Supporting link:
Town of Waterbury — Zoning Regulations and Permit Information
An exemption from one regulatory process is not an exemption from all regulatory requirements.
-
Has the proposed housing development undergone historic preservation review?
As of November 20, 2026, the Alliance has not identified a completed historic preservation review of the proposed housing development or the associated property transfer.
The Alliance is seeking clarification from the Vermont Division for Historic Preservation regarding the property's historical significance and applicable preservation requirements.
Supporting link:
Vermont Division for Historic Preservation — Review and Compliance
-
Is Stanley-Wasson being pursued as a public-private partnership?
The proposed development involves active collaboration between the Town of Waterbury and a private developer, DEW Properties.
The Town's role extends beyond the acquisition and subsequent transfer of State-owned land. Under the executed Pre-Development Agreement, the Town has agreed to assist with financing, grant applications, tax credits and the exploration of public infrastructure funding.
While the developer is responsible for its own due diligence and development permitting expenses, the agreement also identifies potential municipal expenditures and administrative responsibilities.
The final development agreement, financing structure and allocation of long-term financial responsibilities have not yet been established.
The Alliance believes that any public-private development arrangement should clearly identify the public benefits, financial obligations, allocation of risk and safeguards for taxpayers.
Supporting links:
August 5, 2025 — Town of Waterbury RFQ
Executed Pre-Development Agreement — Sections 14, 16 and 17
Questions that remain unanswered:
What financial risks would the Town assume?
Would the Town retain any ownership interest or ongoing obligations?
Would the development be financially viable without public assistance?
What measurable public benefits would Waterbury receive in exchange for its investment?
How will independent regulatory review be maintained given the Town's role in facilitating development?
Are there existing infrastructure concerns within the surrounding neighborhood and the broader community?
Yes. Neighborhood residents have reported sewer and stormwater backups into basements during flood events.
The Edward Farrar Utility District (EFUD) has also documented significant flood-related challenges within its wastewater system.
According to the District's 2024 Annual Report, approximately 7 million gallons of partially treated wastewater were discharged into the Winooski River during the July 10, 2024 flood due to excessive inflows at the wastewater treatment facility. Similar discharges occurred during the two preceding floods in 2023.
Inflow and infiltration (I/I) occur when stormwater, floodwater or groundwater enters the sanitary sewer system, placing additional demands on wastewater infrastructure.
The District has identified several potential mitigation measures, including installing catch pans in approximately 100 sewer manholes located within the floodplain.
These documented conditions raise important questions regarding infrastructure capacity, environmental impacts, public health, flood resilience and the cost of necessary improvements.
The existing system's capacity and performance during both normal conditions and flood events should be evaluated before additional residential development is introduced into the neighborhood.
Supporting link:
Edward Farrar Utility District — 2024 Annual Report, District Manager's Report, page 12
Is there existing stormwater infrastructure on the Stanley-Wasson property?
Yes. The proposed parcel is subject to a municipal easement for an existing stormwater line.
Neighborhood residents have observed this stormwater drainage system surcharging (backing up and overflowing) early during flood events, before river floodwaters reach State Drive.
Section 14(g) of the Pre-Development Agreement (PDA) anticipates that this stormwater line may need to be relocated to accommodate the proposed development.
The Town and developer have agreed to explore funding options for its potential relocation, including CHIP financing.
Given the existing drainage concerns, any proposed relocation should include a comprehensive evaluation of the system's capacity, performance during flood events and potential impacts on surrounding properties.
The cost, design and allocation of financial responsibility for any relocation have not yet been established in the PDA.
Supporting link:
Executed Pre-Development Agreement — Sections 1 and 14(g)
What is CHIP financing?
Vermont's Community and Housing Infrastructure Program (CHIP) is a tax increment financing mechanism designed to support infrastructure improvements associated with new housing development.
The program allows municipalities to use a portion of future increases in property tax revenue to finance eligible infrastructure improvements.
CHIP is a financing mechanism, not a grant.
Under Section 14(e) of the PDA, the Town and DEW have agreed to explore CHIP financing for public improvements associated with Stanley-Wasson.
The financial implications for Waterbury should be clearly understood before any such financing arrangements are approved.
Supporting links:
Vermont Community and Housing Infrastructure Program
Executed Pre-Development Agreement — Section 14(e)
Will Waterbury taxpayers or utility ratepayers bear any additional costs?
This remains an outstanding question.
While DEW is responsible for its own due diligence and development permitting expenses, the PDA identifies potential municipal expenditures and financial responsibilities.
As of November 20, 2026, the Alliance has not identified a comprehensive public financial assessment establishing the anticipated municipal expenditures, necessary infrastructure improvements, funding sources or long-term financial obligations associated with the proposed development.
Such an assessment should consider both anticipated tax revenues and the potential costs of infrastructure improvements, financing, municipal services, emergency response and long-term maintenance.
The allocation of costs and financial risks among the developer, municipality, utility district and other funding sources should be clearly established before further financial commitments are made.
The Edward Farrar Utility District (EFUD) is a separate municipal entity. Section 14(d) of the PDA expressly states that the agreement does not bind EFUD or waive applicable allocation fees.
Financial feasibility for the developer is not the same as financial benefit for the community.
Supporting link:
-
Does the Alliance oppose housing development in Waterbury?
No. The Stanley Wasson Community Alliance recognizes the need for additional housing in Waterbury and supports responsible development in appropriate locations.
Housing needs, flood resilience, historic preservation, neighborhood compatibility and responsible public investment need not be competing priorities.
The Alliance advocates for evaluating development proposals in the context of all these community priorities.
Why does the Alliance advocate preserving Stanley-Wasson as open space?
Stanley-Wasson is more than undeveloped land. It is part of a nationally recognized historic landscape, an established residential neighborhood and a functioning floodplain.
Preserving the property as open space offers an opportunity to:
Honor the history of the Vermont State Hospital and those who lived and worked there.
Retain existing floodwater storage capacity.
Avoid introducing additional residential development into a flood-prone location.
Preserve the character of the surrounding neighborhood.
Create a meaningful legacy for future generations.
The absence of buildings does not mean the absence of purpose.
Would preserving the property require significant public investment?
Not necessarily. The Alliance's alternative vision does not call for extensive construction, elaborate recreational facilities or significant new infrastructure.
If the State retains the historic property, the SWCA will lobby for a historical marker with references to it’s valuable history in Waterbury and the State of Vermont.
Additionally, a thoughtfully preserved landscape could incorporate modest historical interpretation, native plantings and opportunities for quiet reflection while retaining its existing floodplain function.
Ownership, funding, maintenance and long-term stewardship would need to be evaluated.
Preservation should be considered alongside development when assessing the property's long-term value and potential financial obligations to the community.
What can residents do to help shape the future of Stanley-Wasson?
Community participation is essential.
Residents are encouraged to:
Explore the original documents and public records.
Attend Selectboard, Planning Commission and other relevant public meetings.
Ask questions and share their perspectives with elected officials.
Contribute historical information, photographs and personal accounts.
Participate in the Alliance's efforts to advocate for a responsible future for this property.
The future of Stanley-Wasson deserves an informed, thoughtful and inclusive community discussion.
Preserve the Past.
Protect the Future.
The Public Record Library
Original documents. Historical records. Public decisions.
Historical Research & Preservation
Development Proposals & Agreements
Flood History & Resilience
Municipal & Regional Planning
Act 250 & Regulatory Records
Infrastructure & Public Finances